We are now a month and half into our remodel and things are moving along smoothly!
Check out a few photos of our progress.
06.08.18 | New at Brown
Out With the Old, In With the New!

Interior
The inside framing is complete, and we are now working on electrical & low voltage wiring.
Exterior
We are working on front elevation—all the columns are being squared off, barrel roof tiles have been removed, and the awnings have been taken down. We have also finalized paint colors!